Bolt a side panel to the bottom
Shelving unit with 4 inserts, 147 × 112 cm
2 h 34 min · two people · 22 steps · 23 panels · 100 fittings
Bolt a side panel to the bottom
Tap dowels into 2 shelves and push them onto a side panel
Slide in a divider
Tap dowels into the divider for the next row
Push in the next row of shelves
Slide in the next divider
Tap dowels into the divider for the next row
Push in the next row of shelves
Slide in the next divider
Tap dowels into the divider for the next row
Push in the next row of shelves
Tap dowels into the open ends
Slide on the top
Bolt on the other side panel
Stick the felt pads under it
Stand it up together
Fix it to the wall
Fold the inserts and push them into their cubes (do this 4 times)
Screw in the hinge plates (do this 4 times)
Screw the insert to the cube (do this 4 times)
Screw the hinges on and hang the doors (do this 4 times)
Fit the knobs and the door stops (do this 4 times)