18×
Tap the dowels into the legs
Trolley table with storage
25 min · one person · 16 steps · 10 panels · 48 fittings
Tap the dowels into the legs
Screw the connector pins into the legs
Push the cross nuts into the long rails
Join the long rails to two legs
Drop the short rails over the long ones
Push cross nuts into the short rails
Push a third leg on and lock it
Bolt the upper rails together
Tap two dowels into the lower rails
Slide the lower tray on
Bolt the middle of the tray
Bolt the tray to the rails
Push cross nuts into the free rail ends
Push the last leg on and lock it
Press the pads under the top tray
Turn the trolley over and set the top tray on